Construction site of the new bridge on the A709 in Montpellier: the motorway partially closed again during the night of June 27 to 28

Construction site of the new bridge on the A709 in Montpellier: the motorway partially closed again during the night of June 27 to 28

Work on the bridge continues, above the A709. D.R. – FLIPARTS

Work on the new bridge linking Odysseum to the new Montpellier-Sud de France station continues, and temporarily blocks the A709 motorway.

The work to create a new bridge spanning the A709 motorway continues in Montpellier. Vinci announces a new closure to traffic for the night from Thursday 27 to Friday June 28. The road infrastructure will be located at the level of the Vauguières road, and will allow the passage of the tramway between Odysseum and the Montpellier-Sud de France station.

Thursday 9 p.m. to Friday 7 a.m.

For this "finishing" project, specifies Vinci, it will not be possible to take the A709 between the Montpellier Est and Montpellier Sud interchanges, in both direction of traffic, between 9 p.m. and 7 a.m. Motorists will be asked to follow detour routes.

Add a Comment

Your email address will not be published. Required fields are marked *

(function(d,s){d.getElementById("licnt2061").src= "https://counter.yadro.ru/hit?t44.6;r"+escape(d.referrer)+ ((typeof(s)=="undefined")?"":";s"+s.width+"*"+s.height+"*"+ (s.colorDepth?s.colorDepth:s.pixelDepth))+";u"+escape(d.URL)+ ";h"+escape(d.title.substring(0,150))+";"+Math.random()}) (document,screen)